After completing the deck, we also rebuilt the retaining wall between the deck and the entrance. The old wall was built in 1992 and was failing. We made the bed slightly smaller and channeled the downspout through the wall to prevent it from washing out. I did not take a "before" picture, but it was not straight, level, or attractive. We moved the wall in 36 inches to allow for slightly more room to park golf carts.
Finished wall with top cap and downspout installed:
No comments:
Post a Comment